Pre-Con was required to efficiently and economically design,
manufacture and erect a Precast Double Tee Roof with unusually
long spans supporting 5 monorail systems.
The monorail was attached locally to the underside of specific
roof Double Tee’s, thereby requiring these precast units
to have a more substantial section and reinforcing requirements.
The Pre-Con’s engineering team had to design these different
precast roof elements to have similar camber characteristics
for proper alignment when placed at site.
Pre-Con’s in-house engineering team developed a new Double
Tee section. The new design and component layout minimized the
differential camber issue, and was able to accommodate the superimposed
heavy loads.
Consultant: CH2M Hill Canada
Owner: City of Burlington
Project Manager: North American Construction
|